Results that can be verified.
Each case documents problem, approach and result with real metrics.
ARR feasibility study across 12,000 ha in the Cerrado
Problem
An impact fund needed to assess the feasibility of a reforestation project before committing investment.
Approach
Analysis of native vegetation, anthropic pressure, land tenure conflicts and carbon estimation via allometric models.
Result
Technical report in 3 weeks with a risk map and potential of 280,000 certifiable tCO₂. Data-driven investment decision.
Methodology and technologies
- Modelos alométricos
- Análise fundiária
- Sensoriamento remoto

Análise aérea de viabilidade técnica de área de reflorestamento com 12.000 ha e potencial de 280 mil tCO2e
GHG inventory automation for a large industrial company
Problem
Annual inventory assembled manually in spreadsheets, with high risk of inconsistency and rework each cycle.
Approach
Automated pipeline with collection, validation, calculation and integrated report generation.
Result
70% reduction in inventory consolidation time and elimination of recurring manual entry errors.
Methodology and technologies
- Pipeline automatizado
- Integração de fontes
- GHG Protocol

Pipeline automatizado de inventário de GEE integrando 23 fontes de dados
MRV system for an ongoing REDD+ project
Problem
Project underway without a structured monitoring system, at risk of a negative audit.
Approach
MRV plan implementation with Sentinel-2 time series, automatic reports and a compliance dashboard.
Result
Project approved in audit. The automated system cuts monitoring cost by 60% per year.
Methodology and technologies
- Sentinel-2
- Séries temporais
- REDD+
- Painel de compliance

Painel do projeto REDD+ Amazônia com projeção de geração de créditos de carbono
Turn complexity into reliable structure.
Request a technical diagnostic and discover how to organize, automate and scale your processes.

